Backup datacenter AZ Groeninge Kortrijk, BE Studiebureau Boydens

description

Construction of a fall back data center Tier 2+ classification:
The project includes 2 cold isles with 35 racks in total.

In terms of security and energetic division, the following separation has been made of the rooms:
- Technical room with collector and air handling unit
- Staging room equipped for human occupation in terms of temperature control
- Patch room
- Battery room
- Inverter room

The technical installation comprises:
- 2N chillers of 120 kW, possibility of partial load operation
- Redundancy circulation /> - Leak detection
- Free air cooling on the hot isle (with appropriate protection against dust and fire)

- In row cooling with variable speed fans, N+1 setup in each cube and space is provided for additional row coolers with increased power
- 2 feeds per rack equipped with pdu
- 1 generator 300kVA
- N+1 ups for 8 min support
- Novec 1230: ODP 0, GWP 1

az groeninge

general data

total area: 176 m²

Study start date:: November 2012

completion date: June 2014

nature of work: Construction: study and following up MEP

cost techniques: € 687.854,62 VAT excluded

client

AZ Groeninge, President Kennedylaan 4, 8500 Kortrijk, Belgium

architect

Snoeck & Partners Architectuur & Engineering nv, Engelse Wandeling 70, 8510 Kortrijk-Marke, Belgium