'Het Gielsbos' in Gierle, BE Studiebureau Boydens

description

Winner of architecture prize 2015

The Gielsbos:
Is an assisted living community for 287 mentally challenged individuals that are often combined with other disabilities and/or behavioral problems.
The 85 ha green domain is equipped with all the necessary facilities for living, daytime activities, treatment, guidance and recreation remaining open to society.

The project: The Gielsbos project comprises the gradual replacement of existing pavilions to accommodate the mentally disabled.
The scope of the new master plan consists of first removing existing structures on the site, then developing 5 cluster pavilions enclose between 5 to 7 homes with approximately 10 residents each.
Each cluster pavillion has a surface of 2.600m².

The Rozendries living community is particularly focused on individuals with serious multiple disabilities.
The Klaverveld living community is focused to meet the requirements of people with behavioral and or emotional problems.

Technical equipment: boydens engineering is responsible for the entire technical equipment of the houses (heating, ventilation, public health and electricity), the infrastructure on the terrain and energy performance reporting.
The heating requirements of the individual houses are achieved using heat pumps combined with a BTES system.
One central technical room under the roof shelters the heat pumps, boilers, buffer tanks, sanitary hot water production and water softener.
Ventilation is accomplished by an air treatment unit with heat recovery per house.
Due to the vulnerability of the occupants, the living areas and rooms are conditioned with under-floor heating and covered convectors, in order to maintain comfortable temperatures without this being compromised.
Each house is equipped with 1 common flexible bath room, living room and kitchen.
The rooms are equipped with a sanitary cell, a call system and video surveillance if the occupant’s needs require this.

Gielsbos, Gierle

general data

total cost price: Phase 1: € 6.630.000,00; Phase 2: € 5.339.211,00; Phase 3: € 4.680.000,00

total area: Phase 1: 3.822 m²; Phase 2: 2.640 m²; Phase 3: 2.600 m²

Study start date:: September 2010

completion date: December 2017

nature of work: Construction: Study and following up MEP / EPBD reporting

cost techniques: Phase 1: € 1.960.219,34 excl. VAT; Phase 2: € 1.521.288,21 excl. VAT; Phase 3: € 1.505.298,46 excl. VAT

sustainable

K Level: Phase 1: 27; Phase 2: 29
E Level: Phase 1: 64
Certification: -

client

Het GielsBos, Vosselaarseweg 1, 2275 Gierle, BE

architect

Dierendonckblancke Architecten bvba, Nederkouter 111, 9000 Ghent, BE