page background

Sofitel & Novotel, LU Studiebureau Boydens

description

The project comprises two hotels for the Accor Hotel Group of varying service levels built in the same location. The 5 star luxury hotel Sofitel consists of  130 guest  rooms and suites, as well as lobby, restaurant, bar and meeting rooms. The 4 star hotel  Novotel consists of 150  guest rooms, with the lobby, restaurant and meeting rooms  

The energy production is located centrally between both hotels. This allows hot water production to be distributed centrally to  the 280 rooms, kitchens, bars, changing rooms, and other locations. The hot water pipes are made a multi layer plastic with an aluminum core and  are sound insulated. The return temperature of the hot water plumbing is always above 55°C.  It is also possible  to disinfection these plumbing lines and the buffer vessels by increasing the temperature to 70°C, whenever the client requests this. All energy consumption (water, hot water, heating, cooling and electricity),  that is divided into several zones are measured and centralized by the central management.

Hotels Sofitel & Novotel,Luxembourg

general data

total area: 16.352 m²

Study start date:: March 2005

completion date: March 2008

client

Building & Engineering NV for Accor Hotel Group

architect

Bureau d'Architectes WERNER S.A.