This 2 phase  project consists of the renovation of the existing  swimming pool and the extension of the recreational area.  All technical equipment of the pool has been renewed.  Boydens was awarded this project based on the fact that via extensive planning and execution we were able to gaurentee that the pool would be fully operation within 35 calendar days.

The extension project consists the following:  25 m pool, an instruction  pool, wading pool, outdoor slide  and a whirlpool. All technical installations have been placed in the basement of the structure.  The ventilation and dehumidification is  by the air handling units with integrated heat recovery. The filters have a hydro-anthracite layer. General heating is achieved by connecting to the incinerators heat networking and one of the boilers installed for any emergency and maintenance situations.
The control of all systems is automated  and managed  via a graphical interface which is viewed by the city services at other locations.

Indoor Swimming Pool,Roeselare

general data

Study start date : October 1998
Completion date: November 2003

client

City of Roeselare

architect

Van Acker B. & Partners, Architectenbureau