Jan Breydel Stadium in Bruges Studiebureau Boydens

description

During the short period between the end of one soccer season and the beginning of the next, the field was to be entirely excavated for the installation of the new drainage, the integration of an underground irrigation system and the installation of a new field structure with integrated field heating.

For the field heating, heat is produced through condensing boilers and distributed through plastic pipes at 30 cm beneath the turf. The irrigation is accomplished with rainwater that is buffered in the adjacent pond.

Jan Breydelstadion in Brugge

general data

study start – completion date: December 2009 – January 2010
execution start – completion date: May 2010 – October 2010

surface: 8.800 m²

client

Stad Brugge
Club Brugge KV
Cercle Brugge KSV

architect

-