page background

Poseidon (Swimming Pool) in Brakel Studiebureau Boydens

description

The heating and ventilation system was outdated and even partially out of service.
The new facility has an air group, with an integrated heat pump that heats  the pool, a new furnace room with  new gas-fired boilers, a solar panel to heat the water system in the showers (using 72m ² of solar panels all digitally controled  centrally).

Poseidon, Brakel

general data

Study start date: February 2007
Completion date: April 2010

Surface: 550m²

client

Town of Brakel
 

architect

-