SHARE

SBB office

oudenaarde, Belgium, Europe

Sector Offices
Project status completed
Location oudenaarde, Belgium, Europe
Execution June 2018 - January 2019
Architect AVDK / architecten Vande Kerckhove bvba, Kortrijksestraat 88, 8501 Heule, BE
Study March 2017 - February 2018
GFA 648 m2
Scope Study and following up MEP
Intervention Renovation
Client Aktiefinvest cvba, Diestsevest 32 bus 5b, 3000 Leuven, BE
Total technical installations cost:222.838,37 € VAT excluded
Total construction cost:890.000,00 € VAT excluded
K Level:
 E Level:
Certification:

 

Project description:

The working spaces and the sanitary rooms of the SBB office in Oudenaarde have been thoroughly renovated.

A new technical room has been created on the first floor, in function of the new technical installations.

On the outside, the existing cooling machine has been replaced by a heat pump, which is also responsible for the heat demand of the building. The existing gas-fired boiler has been removed from the building.

Fan coil units were placed in the ceiling of the office spaces and on the walls of the corridors, they are controlled by room thermostats. The fan coil units are responsible for both the heating and the cooling of the offices.

To create a comfortable indoor climate a ventilation system type D with heat recovery via a plate heat exchanger was installed. During the mid-season, top cooling takes place via an air handling unit. Electricity consumption is limited by installing LED lighting and new PV panels on the roof.

Furthermore, all techniques were integrated in the rooms, such as electricity, data network and fire detection, in order to meet current standards.

Sustainable Features

comfort
comfort
heat recovery
heat recovery
insulation
insulation
PV panels
PV panels