SHARE

‘Terra Nova’ apartments and underground parking

Neder-over-Heembeek, Belgium, Europe

Sector Residential
Project status completed
Location Neder-over-Heembeek, Belgium, Europe
Execution January 2018 - May 2020
Architect a2o architecten cvba, Vissersstraat 2, 3500 Hasselt, BE
Study July 2013 - January 2016
GFA 6,250 m2
Scope Study and following up MEP / EPBD reporting
Intervention Construction
Client Solidum Real Estate Development nv, Viartenstraat 14, 3520 Zonhoven, BE
Total technical installations cost:€ 1.558.616,29 excl. VAT
Total construction cost:€ 6.259.076,91 excl. VAT
K Level:Varying from 30 to 32 (Max. 40)
 E Level:Varying from 41 to 55 (Max. 70)

 

Project description:

The Solidum Group is active throughout Belgium and develops residential real estate with a focus on apartments and subdivisions.

 

‘Terra Nova’ consists of an apartment complex with 42 apartments and an underground parking garage.

Each apartment is equipped with a condensing boiler with radiators and an individual ventilation system D with heat recovery.

Through the application of PV panels, the energy bill for electricity is reduced and a lower E-level.

Video telephony has been applied and the apartments were equipped to be connected to the fiber optic network of the telecom operators.

Sustainable Features

comfort
comfort
glazing
glazing
green roof
green roof
heat recovery
heat recovery
water management
water management
reuse rainwater
reuse rainwater
PV panels
PV panels
insulation
insulation